01/2022 – present  Sole Trader (SeklerGeo); Since 12/2023: geotechnical engineer at TunnelTech Ltd.; Assistant Professor at Óbuda University Ybl Miklós Faculty of Architecture and Civil Engineering

08/2021 – 12/2021   Paks II. Nuclear Power Plant Development Private Company Limited by Shares

Leading establishing expert.

02/2016 – 08/2021   Mecsekérc Ltd.

As project engineer (geologist, engineering geologist) I was working in several seismic surveying projects around Pécs city. I had been joining the HLW, L/ILW radioactive waste repository investigation programs.

 

10/2013 – 02/2016   MVM Paks II. Nuclear Power Plant Development Private Company Limited by Shares 

As site expert (geologist) I had been working on the ground exploration project around the Paks Nuclear Power Plant (Hungary). I had been responsible for the technical preparation of the 3D seismic survey and the full complex geological investigation program tenders (TED process), afterwards during the execution of the project, I was responsible for the checking of the 3D seismic survey site measurements, data processing and data interpretation. During the geological investigation I was reponsible for the following fields: geology, geotectonics, earthquake hazard evaluation, numerical modelling, geotechnics.

 

05/2013 – 09/2013   Transinvest Budapest and Transinvest Iraq Kurdistan Ltd.

As an engineering geologogist consultant I checked the design of the Penjween and Darbandichan tunnels – the Client was the Regional Government – Sulaymaniyah – Kurdistan.

The design is based on NMT philosophy. A section of the excavation which is crossing the “Zagros Main Fault Zone” has been designed by NATM approach.

 

04/2009 – 05/2013   ROCKSTUDY LTD. (Kőmérő Kft.)

As a geotechnical engineer, I was continuing the geotechnical and rock mechanical supervision of Bátaapáti Nuclear Waste Repository project (including the engineering geological tunnel mapping and preparing complex scientific reports). Our company was carrying out the most geotechnical, rock mechanical in situ and laboratory measurements as well as their analyses from Bátaapáti Nuclear Waste Repository project (eg. Overcoring measurements with CSIRO and doorstopper methods, mechanical convergence, extensometer measurements, crack monitoring etc.)

– cooperation with WILDHORSE Energy company: rock mechanical and geomechanical modeling work for the feasibility study of Mecsek Hills UCG (Underground Coal Gasification) Project.

09/2008 – 04/2009   MOTT MACDONALD GROUP

Engineering Geologist – Transportation Europe Division, Budapest

 

Bátaapáti Nuclear Waste Repository – Design work for the IIIrd excavation phase of Bátaapáti nuclear low- and intermediate-level radioactive waste repository, rock support and grouting, in-situ rock measurements. Besides this work we have been modeling the rock mechanical behavior of the host rock and reporting of the results.

There are two parallel acces tunnels (with 1.7 km length, 21 and 25 m2 tunnel sections) in fractured granite (monzogranite and monzonite) ground, intersected with fault and weathered zones. The repository caverns are designed with 96 m2 cross section. The underground facility is being excavated by drilling-blasting excavation method NMT, with shotcrete and rockbolt pattern rock support.

Delhi metro project – designing of the in situ soil- and rock mechanical monitoring system.

Heathrow Baggage Tunnel to T5, London – assistance in the numerical modelling as a part of the checking of this work. (www.mottmac.hu)

 

06/2008 09/2008        ROTAQUA.ROM S.R.L.

(Core drillings, geological exploration of solid mineral raw materials, environmental, geotechnical and water well drillings etc. in Romania)

 

  09/2004 – 06/2008   MECSEKÉRC ENVIRONMENTAL LTD.

  Geotechnical Engineer, acting leader of the Geotechnical Department

 

Boda Clay Formation (BAF) a potential host rock for the high level radioactive waste repository – I worked in this research project as a geologist.

 Bátaapáti Nuclear Waste Repository – Construction of the twin exploratory inclined access tunnels:

 –     Engineering geological/geotechnical work eg. tunnel mapping (with JointMetriX3D and present with ShapeMetriX3D system at RockStudy Ltd.), inclinometer, extensometers surveying, handling of geotechnical documents.

–     Design and implementation of extensometers, mechanical convergences, strain gauges installation.

–     During construction of overground and underground: geological and engineering geological mapping (we were using a modern photogrammetry system which we were able to generate real 3D models and analyses from the tunnel wall surface: JointMetrix3D, www.3gsm.at), technical inspections (eg. rock support, grouting) and technical support.

–     Pre- and post-grouting design.

–     Geological and engineering geological investigations and planning.

–     Evaluation of all geotechnical data, including assessment of RMR, Q and GSI methods.

  • Geological and geotechnical drill core logging.
  • Reporting all results in Hungarian and English languages.

(www.mecsekerc.hu)

 

06/2001 08/2001– Bakonyi BAUXIT MINE Ltd.

(geological exploration, stock calculations; student summer work, Hungary)

 

As SOLE TRADER (SeklerGeo)

2023 – Installation of a seismometer monitoring system in the Hungarian National Radioactive Waste repository. Followed the installation I am checking the collected data and reporting periodically the analysed results.

2022 – Supervising of 3D seismic survey around Kutina-Novska for Hydrocarbon exploration:the surveying was carried by the Geofizyka Torun Ltd. from Poland. 

(Client: Vermilion Zagreb Exploration d.o.o. Croatia)

2022 – Tunnel project: Feasibility study: Design and Execution of the highway Brasov – Targu Mures – Cluj – Oradea Subsection 3A2; Nadaselu – Mihaiesti (km 8+700 … km 25+500) and Zimbor – Poarta Salajului (km 13+260 … km 25+500).

Studies on 3 tunnels:

  1.  Cut and Cover tunnel (km 22+875 … km 23+385); 2. Cut and Cover tunnel (km 17+610 … km 18+116); 3. Mined Tunnel (km 13+270 … km 14+160).

(Client: main UMB Group Srl., Romania, contract with TunnelTech Kft. Hungary)

2021 – 2022 Installation and operation of the 2 Geotechnical Monitoring Sections – M85 Motorway’s Tunnel; the section contains Multi Point Borehole Extensometers (MPBX) and NATM Load Cells

(Client: main HIDRO-DUNA Kft., contract with Geogold Kárpátia Kft.)

2020 – Rock Cliff stability evaluation by using rock mechanical methodologies – Cetatuia, Cluj-Napoca. Rock clif stability evaluation, by using numerical modelling and the convetional empirical calculation methods: SRMR, RMR and GSI.

(Client: GeoSearch Ltd. – Cluj, Romania)

2019 – Earthquake hazard evaluation – PSHA calculation of the Office buildings – Budapest (Váci út 23-27.) – Designer: Skanska

(Client: Speciálterv Kft., Hungary)

 

2019 – Earthquake hazard evaluation – PSHA „STUDIU DE FEZABILITATE, PUZ SI DTAC PENTRU PROIECTUL DRUM TRANSREGIO FELEAC TR35”. Preparation of the earthquake hazard evaluation study for the project in the Cluj traffic ring, by using the PSHA method. Preparation of summary report or „Final Report” in English and Romanian langueges.

(Client: S. C. EXPLAN Srl.; Cluj; Romania)

 

2019 – Geotechnical and engineering geological integration report of the M85 higway tunnels (beside Sopron city – Hungary) – basic document for the final design – This is a typical highway twin tunnel system with 780 m length and two cross tunnels.

(Client: Dömper LTD., Hungary)

 

2019 – Earthquake hazard evaluation of the underground facilities of Bátaapáti radwaste repository (time dependent static and numerical modeling investigations)

(Client: Public Limited Company for Radioactive Waste Management – Hungary).

 

2018 – Underground seismic tomography measurements in the National Radioactive Waste Repository LILW – Bátaapáti

(Client: Public Limited Company for Radioactive Waste Management – Hungary).

 

2017-2018 – Preparing of the geological background and earthquake hazard evaluation for the project: „The first and second stages of seismic rehabilitation service for 3 bridges in Teheran” (Client: Tehran Engineering and Technical Consulting Organization -TETCO, Iran).

 

2016-2017 – Rock Slope Stability Design in Romania. Project: „Reabilitare drum comunal 4A, Tronson Magura Ilvei – Arsita km 1+215 – 1+360”

(Client: GeoSearch Ltd. – Cluj, Romania).